ADU Site Prep & Utilities in Burbank - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

17+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Trusted ADU Site Prep & Utilities for Burbank Homeowners

ADU Site Prep & Utilities - Burbank typically run $18,000-$65,000 depending on scope, with most projects quoted at a single written price before any ground is broken. We’re Ellery ADU Studio, a design-build practice led by Nadia Ellery, and we’ve handled the site work for more than 900 ADUs since 2015 - every one with a documented photo record and a written price locked under Haven Standard, Clause 1. Call (747) 322-4648 to schedule your free estimate; a live person answers 24/7.

Call (747) 322-4648

Burbank’s hillside lots, aging utility infrastructure, and specific zoning around the Verdugo Mountains and Magnolia Park create site conditions that differ block by block. A homeowner in the Rancho area might need extensive grading for a detached unit, while a property near downtown Burbank could require a 200-amp panel upgrade that the existing service lateral can’t support. We’ve worked both scenarios, and we quote them with line-item specificity before the contract is signed.

Our ADU Site Prep & Utilities in Burbank service is not an afterthought tacked onto a construction contract. It’s a standalone discipline within our single-contract design-build model, coordinated with the permit set from day one so the foundation, utilities, and final structure all match the drawings that Burbank Building & Safety approved.

What Our ADU Site Prep & Utilities Service Includes

Foundation & Grading

Foundation work for an ADU in Burbank starts with a soils assessment, particularly on the north-facing slopes near the Verdugo Mountains where expansive clay can shift footings seasonally. We determine whether your project needs a conventional spread footing, a post-tensioned slab, or pier-and-grade-beam construction based on the geotechnical report and the city’s hillside development requirements. Our crew documents existing grade with survey-grade equipment, calculates cut-and-fill volumes for permit submission, and pours to the exact elevation shown in the structural drawings - no field adjustments that later conflict with the approved set.

Most Burbank foundations for detached ADUs run 18-30 cubic yards of concrete, with rebar tied to the engineer’s specified spacing. We photograph every phase: exposed subgrade, vapor barrier placement, steel layout before the pour, and the finished slab with elevation verification. That photo record goes to you and to the city inspector, so there’s no dispute about what was built versus what was drawn.

Foundation & Grading

Electrical Panel Upgrade

Burbank’s older housing stock - especially the 1940s-1960s bungalows near Magnolia Park and the ranch homes south of Alameda Avenue - often carries 100-amp or smaller panels that cannot handle an additional dwelling unit. We assess your existing service size, load calculations for the ADU, and the capacity of the underground lateral from Burbank Water and Power’s transformer. If the math requires it, we specify a 200-amp or 400-amp panel replacement with a new service lateral, conduit run, and grounding system.

We coordinate directly with Burbank Water and Power for service upgrades, which in our experience adds 2-4 weeks to the schedule due to their inspection queue. That lead time gets built into your project timeline from the first permit submission, not discovered mid-construction. Under Haven Standard, Clause 5 (No Surprises), the electrical scope and its associated cost are locked at contract signing.

Electrical Panel Upgrade

Plumbing Lateral

The plumbing lateral connects your ADU to the city sewer main, and in Burbank this often means trenching through established landscaping, crossing existing hardscape, or navigating tight side-yard setbacks. We pull the as-built records from Burbank Public Works when available, then verify with camera inspection if the line’s age or material is uncertain. Cast iron laterals from the 1950s and 1960s are common in the hillside neighborhoods; we flag these for replacement rather than tying into degraded pipe.

Our plumbing scope includes water supply sizing for the ADU’s fixture count, backflow prevention where required, and sewer cleanout placement that meets current code. We handle the permit, the trenching, the connection, and the compaction testing - one line item, one responsible party. If you’re considering a similar project in North Hollywood, the lateral depth and soil conditions differ; we adjust the specification accordingly.

Plumbing Lateral

Gas Line Extension

Gas service for an ADU in Burbank requires a pressure test, permit, and inspection by the city’s Building & Safety division, plus coordination with Southern California Gas Company for meter sizing and line capacity. We calculate BTU load for the ADU’s appliances - water heater, furnace or mini-split backup, range if specified - and determine whether the existing meter can handle the additional demand or needs upsizing.

Trenching for gas line extension in Burbank’s established neighborhoods means locating existing utilities with USA North 811, then hand-digging near marked lines. We document the trench depth, pipe bedding, and pressure test results with photos, and we don’t cover the line until the inspector has signed off. For properties in the hillside zones, we sometimes specify flexible corrugated stainless steel tubing (CSST) where rigid black iron pipe would require excessive fittings on uneven terrain.

Gas Line Extension

Landscaping & Hardscape

Site prep doesn’t end at the ADU’s exterior walls. Burbank’s municipal code requires permeable surface ratios, fire-safe landscaping in Very High Fire Hazard Severity Zones (portions of the Verdugo foothills), and ADA-compliant paths of travel where the ADU is rented or occupied by family members with mobility needs. We design and install the hardscape and landscaping as part of the same contract, coordinated with the grading and utility trenches so you’re not paying to restore a patio that a later plumber tears through.

Our landscaping scope includes soil preparation, irrigation tie-in or conversion to drip, and plant selection that meets Burbank’s water-wise guidelines. Hardscape covers concrete walkways, patio slabs, retaining walls under 4 feet, and driveway modifications for additional parking if the ADU triggers that requirement. Every element appears on the permit set; nothing is “figured out in the field.”

Landscaping & Hardscape
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (747) 322-4648

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Brands We Service for ADU Site Prep & Utilities

Professional designer drawing custom ADU floor plans on grid paper
Brands We Service for ADU Site Prep & Utilities

We specify and coordinate prefab and modular systems where the site prep must match factory-built dimensions precisely. For Abodu units, we’ve completed foundation and utility tie-ins for more than a dozen installations in the Burbank area; their crane-set modules require a level, compacted pad within 1/4-inch tolerance, and we engineer that pad to their spec while handling the sewer lateral and electrical stub-up in the exact locations their drawings require. The alternative is a field modification that voids warranty coverage.

Cover homes demand similarly precise site work - their automated design-to-fabrication pipeline means the foundation anchor points and utility penetrations are fixed before the module ships. We receive their structural and MEP coordination drawings during our design phase, not after the foundation is poured, so the slab we build accepts their unit without grinding, shimming, or emergency conduit reroutes. We’ve also worked with Dvele systems, where the all-electric specification eliminates gas line extension but requires a larger electrical service and dedicated EV-ready circuit that we size from the start.

Whether your ADU is Abodu, Cover, Dvele, or a conventional stick-built structure, the site prep and utilities follow the same principle: the built work must match the permitted drawings exactly, or the 365-Day Done Right Promise is triggered.

BeforeBefore
AfterAfter

Signs You Need ADU Site Prep & Utilities Right Now

  • Your existing electrical panel is full or dated to the 1970s. A panel with no spare breaker slots, screw-in fuses, or Zinsco/Sylvania branding cannot safely support an additional dwelling unit. We assess load capacity and specify replacement before the ADU framing begins, not after the drywall is up and the city inspector fails the rough electrical.
  • The backyard slopes more than 6 inches across the proposed ADU footprint. Burbank’s hillside ordinance triggers additional engineering and grading requirements at relatively modest slopes. We survey early, design for the actual topography, and avoid the scenario where a flat foundation plan hits a sloped site and requires expensive change orders.
  • Your sewer line has backed up or shows root intrusion on camera. An ADU adds fixture units to a system that may already be at capacity or compromised. We camera-inspect the lateral, identify bellies, cracks, or root masses, and specify repair or replacement as part of the site prep scope - not as an emergency excavation after the ADU is occupied.
  • Natural gas service is limited to a single small meter. If your home runs on gas for heat, water, and cooking, the existing meter and regulator may not deliver enough pressure and volume for an ADU’s additional appliances. We pressure-test the system, calculate total load, and specify meter upsizing or electric conversion before appliance selection locks in.
  • Required setback or fire separation distance conflicts with existing hardscape or landscaping. Burbank requires 4-foot minimum side and rear setbacks for detached ADUs, plus specific clearances for eave and soffit projections. If your existing patio, retaining wall, or mature tree sits in that zone, it needs relocation as part of site prep - not discovery during the foundation layout.

Our ADU Site Prep & Utilities Process - Step by Step

Designer and client reviewing professional ADU architectural design plans
Our ADU Site Prep & Utilities Process - Step by Step
  1. 1
    Site survey and utility locate. We visit your Burbank property with survey equipment to document existing grades, structures, and hardscape. We call USA North 811 for utility marking and pull available as-builts for sewer and water laterals. You receive a photo record of conditions before any work begins.
  2. 2
    Geotechnical and structural engineering. For hillside lots or where the soils are unknown, we engage a geotechnical engineer for a soils report. The structural engineer then specifies foundation type, footing depth, and reinforcement based on actual conditions, not assumptions. This report becomes part of the permit set submitted to Burbank Building & Safety.
  3. 3
    Permit set integration. The site prep drawings - grading plan, utility plan, electrical service diagram, plumbing isometric - are integrated with the ADU architectural and structural set as a single submission. One set of drawings, one approval path, no gaps between what the designer drew and what the builder needs.
  4. 4
    Written quote with line-item scope. Under Haven Standard, Clause 1, you receive a written price before any work starts. The quote breaks out foundation, electrical, plumbing, gas, and landscaping as separate line items so you understand what each discipline costs and where trade-offs might be possible.
  5. 5
    Execution with documented verification. Our crew builds to the permitted drawings, photographing each critical phase: excavated footing, rebar and conduit before concrete, pressure tests, final grade. Burbank inspectors review at rough and final; we coordinate scheduling and ensure sign-off before the next phase begins. The photo record and inspection approvals are delivered to you at project completion.
Get the price in writing before anything starts.Serving Burbank - a real person answers, day or night.
Call now

How Much Does ADU Site Prep & Utilities Cost in Burbank?

Per our ADU Site Prep & Utilities cost guide, Burbank projects typically range from $18,000 for a simple garage conversion with existing utility capacity to $65,000 for a hillside detached unit requiring full grading, 200-amp service upgrade, and new sewer lateral. Here’s how common scenarios break down:

  • Foundation & Grading: $8,000-$22,000. A garage conversion on an existing 4-inch slab with no expansive soils issue sits at the low end. A new detached ADU on a sloped lot with engineered fill and retaining walls reaches the high end.
  • Electrical Panel Upgrade: $4,500-$12,000. A straightforward 100-amp to 200-amp swap with existing adequate lateral capacity runs lower. A new underground service lateral from the Burbank Water and Power transformer, or a 400-amp service for a larger ADU with electric vehicle charging, runs higher.
  • Plumbing Lateral: $3,500-$9,000. Tying into a modern sewer line with minimal trenching is straightforward. Replacing 60 feet of corroded cast iron under established landscaping, or navigating a tight side yard with hand digging, adds cost.
  • Gas Line Extension: $2,000-$6,500. A short run to a nearby meter with adequate capacity is simple. A long run with meter upsizing, pressure regulation, and multiple inspection points requires more labor and material.
  • Landscaping & Hardscape: $4,000-$15,000. Minimal restoration of turf and a concrete walkway is at the low end. Extensive hardscape, retaining walls, fire-safe plantings, and irrigation systems for larger properties reach the high end.

What moves the price: soil conditions requiring engineered solutions, utility pole or transformer relocation by Burbank Water and Power, fire department access improvements in hillside zones, and the need to protect mature specimen trees during trenching. What doesn’t move the price: our quote is fixed at signing under Haven Standard, Clause 5. The scope is locked; no door-side upsells, no “we found something unexpected” additions without a written change order that you approve.

How to avoid overpaying: get a second opinion. We offer a Free Second Opinion on any written estimate already in hand. We’ll review the scope, identify missing line items or inflated allowances, and give you our assessment without obligation. Many Burbank homeowners who’ve used this service discovered that a competitor’s “low” bid excluded permit fees, inspection scheduling, or restoration - costs that appeared later as change orders.

What’s included in our free estimate: site visit, utility locate, preliminary soils assessment if indicated, written line-item quote, and permit strategy. Call (747) 322-4648 to schedule.

ADU Site Prep & Utilities Near Burbank - Our Service Area

Professionals reviewing ADU architectural blueprints and site plans during design consultation
ADU Site Prep & Utilities Near Burbank - Our Service Area

We handle ADU site prep and utilities throughout the Burbank area and adjacent communities, including Glendale, North Hollywood, Studio City, Van Nuys, West Hollywood, Sherman Oaks, Beverly Hills, Encino, Pasadena, Sylmar, and West Los Angeles. Response time for initial site survey is typically 24-48 hours in Burbank proper, with slightly longer lead times for outlying areas during peak permit seasons. Each city’s utility infrastructure and zoning differ - Glendale’s water and power department has separate requirements from Burbank Water and Power, for example - and we adjust our specifications and permit strategy accordingly.

Serving Burbank, CA - Our Local Coverage Area

We’re based in the Burbank area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked Questions - ADU Site Prep & Utilities in Burbank

HVAC technician installing outdoor condenser unit for garage conversion ADU project
Frequently Asked Questions - ADU Site Prep & Utilities in Burbank

Schedule Your ADU Site Prep & Utilities Service in Burbank Today

Call (747) 322-4648 to schedule your free estimate. A live person answers 24/7. You’ll receive a written, line-item quote before any work starts - guaranteed under Haven Standard, Clause 1 - plus a documented photo record of every phase and the 365-Day Done Right Promise in writing. Nadia Ellery and the team at Ellery ADU Studio have handled site prep and utilities for more than 900 ADUs since 2015; we’ll handle yours with the same specificity.

Written by Nadia Ellery, Owner at Ellery ADU Studio, serving Burbank since 2015.

Why Burbank Chooses Ellery ADU Studio Burbank

We set the standard for adu site prep & utilities in Burbank.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Burbank

Getting your adu site prep & utilities handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu site prep & utilities needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Burbank - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local adu site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Burbank Customers Say

Trusted by homeowners across Burbank and surrounding areas.

★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T. · Verified customer
★★★★★

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

Arjun D. · Verified customer
★★★★★

"Every allowance was itemised at the start, so the finish selections did not turn into a surprise at the end."

Benedict H. · Verified customer

Ready for ADU Site Prep & Utilities in Burbank?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Burbank.

(747) 322-4648

Request a Free Estimate in Burbank

Tell us about your adu site prep & utilities needs - we'll respond within the hour.

By clicking submit, you confirm you have read our Privacy Policy and authorize us to contact you by phone, text, or email regarding your project, including by the service partners who may complete the work.

Prefer to text? Text Us
Local Service Coverage
Call Now - Fast Dispatch