Permit Application in Burbank, CA
Getting a permit application approved by the City of Burbank is the single step that converts a set of drawings into a legal ADU. At Ellery ADU Studio Burbank, we prepare, submit, and track every permit application as part of our ADU Design & Permitting in Burbank service – a single contract that runs from first sketch to final inspection sign-off. Call us at (747) 322-4648 to get a written price before any work starts.
Burbank’s Community Development Department processes ADU permits through a combined building and zoning review. That review checks your project against the California ADU statute (Government Code 65852.2), the City of Burbank Municipal Code, and – for properties near the Burbank Airport influence area or within older residential tracts in Magnolia Park and Rancho – additional overlay requirements that catch out-of-town permit expeditors every time. We’ve been navigating this specific system since 2015, and every one of our 900+ ADU projects came with a documented permit set and a written price before a single sheet was submitted. Our ADU Design & Permitting process is built around that transparency.
Nadia Ellery founded the studio with one premise: the permit set is the product, not the paperwork you tolerate to get to construction. When the drawings, the permit application, and the build are one contract at one written price, nobody can point at somebody else when the city comes back with a correction.
When You Need Permit Application
- You have drawings but no approved permit. Architectural plans from another designer are only as good as the permit they produce. If your drawings are sitting in a drawer while you wait for someone to submit them, you’re losing time and, in Burbank’s current market, rental income. We can review your existing set and advise whether it will pass Burbank’s plan check or needs revision before submission.
- A previous permit application was rejected or corrected. Burbank’s plan checkers issue correction letters – sometimes called “plan check comments” – that require specific responses. If you’ve received a correction letter and don’t know how to answer it in the format the city expects, the project stalls. We’ve responded to hundreds of these letters for Burbank addresses specifically.
- You’re converting a garage or accessory structure in a Magnolia Park or Rancho Park property. Older lots in these neighborhoods often have non-conforming setbacks, pre-1980 slabs, or existing detached structures with no record permits. Each of those conditions adds a layer to the permit application that requires deliberate handling – not a form submission.
- You’re building a new detached ADU and need to coordinate with Southern California Gas, LADWP, or Burbank Water and Power. New detached units in Burbank require utility service applications that run parallel to the building permit. Missing either track adds weeks. We manage both under the same contract.
- Your lender or escrow requires an approved permit before releasing funds. ADU construction loans and some equity products tie disbursement to permit issuance. A submitted-but-not-yet-approved permit satisfies some lenders; others want the approved set in hand. We can tell you exactly where your application stands and provide documentation your lender will accept.
- You’re using a prefab system – Abodu, Cover, or a similar product – and need a manufacturer’s engineered package folded into the Burbank permit set. Prefab ADUs require coordination between the manufacturer’s engineering and the local structural and energy compliance documents. That coordination has to happen before submission, not after the city asks for it.
Our Permit Application Process

-
Written Scope and Written Price – Before Anything Else
Under Haven Standard Clause 1, no work starts without a written price in your hands. For permit application work in Burbank, that means a scope document that names every submission – building permit, zoning clearance, utility coordination letters, Title 24 Energy Compliance package – and the dollar amount attached to each. You know what you’re paying before we touch a form.
-
Site Documentation and Existing Conditions Survey
Our Site Assessment visits the property and records the existing conditions with a documented photo record – measurements, slab thickness, utility locations, setback distances from fence to structure. In Burbank, this step often surfaces things that affect the permit application directly: a detached garage built 18 inches from the rear property line, for example, changes the fire separation language in the permit set. You receive the photo record; it’s yours, not ours.
-
Permit Set Preparation
We produce the full ADU Design & Blueprints permit set: architectural drawings, structural calculations, Title 24 energy calculations, and – where applicable – a soils report waiver or geotechnical reference. For projects using James Hardie fiber cement cladding, the product’s fire rating documentation is folded into the exterior finish schedule so the plan checker has everything in one place. For prefab systems like Abodu or Cover, we coordinate the manufacturer’s engineered package and integrate it with the Burbank-specific sheets the city requires.
-
Submission and Plan Check Tracking
Burbank allows over-the-counter plan check for ADUs that qualify under the state’s ministerial approval rules, and electronic submission for projects that don’t. We know which track your project is on before we submit, which means we don’t waste a trip to the counter with a project the city will route to standard plan check anyway. Once submitted, we track the application and communicate status to you in plain language – not city-speak.
-
Correction Letter Response
If Burbank’s plan checkers issue corrections – and on more complex projects, one round of corrections is common – we respond in writing within the city’s required timeframe. The response is a formal document, not an email. We handle the back-and-forth; you don’t need to become fluent in plan check process to get your permit.
-
Permit Issuance and Construction Handoff
When the city issues the permit, we hand you the approved set with a clear notation of every condition the city attached. Under our one-contract design-build model, that approved set goes directly to our construction crew – the same people who knew the project from the first site visit. The 365-Day Done Right Promise kicks in at this point: if the finished ADU doesn’t match the permitted drawings, we make it right, in writing, before the project starts.
Before
AfterPermit Application Pricing in Burbank
Permit application costs in Burbank depend on the project type, lot complexity, and whether the application requires a full plan check or qualifies for ministerial approval. Below are the ranges we see on projects in this city. Every figure comes paired with a written quote – there is no scenario in which you discover a cost after the work starts.
| Project Type | Typical Permit Application Fee Range (City Fees + Ellery Preparation) | Notes |
|---|---|---|
| Junior ADU (interior conversion, no addition) | $3,500 – $6,000 | Minimal plan check; qualifies for ministerial approval in most Burbank cases |
| Garage Conversion ADU | $5,500 – $9,500 | Varies by structural condition of existing slab and utility configuration |
| New Detached ADU (up to 850 sq ft) | $8,000 – $14,000 | Includes Title 24, structural, and utility coordination; prefab integration adds $1,500 – $3,000 |
| New Detached ADU (851 – 1,200 sq ft) | $11,000 – $18,000 | City plan check fees scale with square footage; soils report may be required on hillside lots |
| Correction Letter Response (standalone) | $1,200 – $3,500 | For existing applications submitted by another designer that need professional correction response |
These ranges reflect Burbank-specific city fees as of early 2026, plus our preparation and coordination work. City fees change; we verify the current fee schedule before quoting. What doesn’t change: you receive a written price before we submit anything, per Haven Standard Clause 1.
Hillside lots in the foothills north of Glenoaks, and older lots in Burbank’s Victory Boulevard corridor with recorded easements, typically land at the higher end of these ranges. If you already have a written estimate from another firm, we’ll give you a Free Second Opinion – a straight read of what’s in it and whether it reflects Burbank’s current plan check requirements.
FAQs – Permit Application in Burbank

How long does ADU permit approval take in Burbank?
Burbank processes ADU applications that qualify for ministerial approval in 60 days or less, per California Government Code 65852.2 – the city cannot extend that timeline for compliant projects. Projects that require standard plan check (typically larger detached ADUs or projects with non-standard structural conditions) take 10 to 16 weeks on average from first submission to approval, depending on correction rounds. We track your application and give you status updates in plain language throughout. Call (747) 322-4648 for a written timeline estimate tied to your specific project.
Do I need a separate permit for utilities – electrical, plumbing, mechanical?
Yes. In Burbank, the building permit covers structural and architectural work, but electrical, plumbing, and mechanical work each require their own sub-permits, which are typically issued alongside the main building permit as part of the same application package. We prepare and submit all of them as a single coordinated submission – you don’t file separately. This matters most on new detached ADUs where Burbank Water and Power requires a separate service application that runs on a parallel track to the building permit. We manage both tracks under one contract. Call (747) 322-4648 for specifics on your utility situation.
What happens if Burbank’s plan checkers reject my application?
Burbank’s plan checkers don’t reject applications outright – they issue a correction letter that lists the specific items requiring change or additional documentation. A correction letter is normal on projects with any complexity; it doesn’t mean the project is in trouble. We respond to correction letters as part of the permit application scope, and our response is a formal written document that addresses each item in the format the city expects. Under our one-contract model, we don’t bill separately for a first round of corrections on projects we prepared. Call (747) 322-4648 if you’ve already received a correction letter on an existing application.
Can I submit the permit application myself and just hire Ellery for drawings?
You can, but we’d encourage you to think through what that splits. The permit application is not a form – it’s a package that includes the drawings, the energy compliance documentation, the structural calculations, and the utility coordination letters, all cross-referenced so the plan checker can follow them. When the designer and the submitter are different parties, correction letters get routed to whoever submitted, and responses require coordination between two offices. Our one-contract model eliminates that gap: we prepare, submit, track, and respond, and the same team that drew the plans answers the plan checker’s questions. The written price you receive covers the full package.
Key Takeaways
- Burbank has a 60-day ministerial approval window for qualifying ADU applications – hitting that window requires a complete, correctly formatted submission on the first attempt.
- City plan check fees in Burbank scale with project square footage and type; our written quote includes the current fee schedule, not an estimate of it.
- Every permit application Ellery prepares comes with a documented photo record of the site conditions found – the same evidence base the permit set is built on.
- The 365-Day Done Right Promise applies from permit issuance through construction: if the build doesn’t match the approved drawings, we correct it, in writing, before the project starts.
- A Free Second Opinion is available on any written estimate already in hand – call (747) 322-4648.
- Prefab systems including Abodu and Cover require manufacturer engineering coordination within the Burbank permit set; we handle that as part of the same single contract.
Talk to Ellery ADU Studio About Your Permit Application

If you’re at the point where the permit application is what’s between you and a legal ADU in Burbank, the next step is a written price, not a discovery call. Nadia Ellery and the studio team at home base for Ellery ADU Studio have prepared permit sets for properties across Burbank – from garage conversions in Magnolia Park to new detached ADUs on the larger lots north of Alameda Avenue. We know which plan checkers to expect, which overlay requirements apply to which tracts, and what a correction letter actually requires in response.
Call (747) 322-4648. A live person answers – no voicemail queue, no callback that doesn’t materialize. If you have a written estimate from another firm, bring it; the Free Second Opinion is a straight read, no obligation. Your written price for permit application work in Burbank is the first document we produce, per Haven Standard Clause 1, before any work starts.
Written by Nadia Ellery, Owner at Ellery ADU Studio Burbank, serving Burbank.